Solar ATAP Malaysia Solutions for Homes and Businesses

Generate clean electricity from your rooftop, utilise it on-site, and receive bill credits for eligible excess energy exported to the grid under Malaysia’s Solar ATAP programme.

EFS Group supports homeowners, commercial buildings, factories, warehouses, and other electricity consumers in adopting rooftop solar through the Solar Accelerated Transition Action Programme (Solar ATAP), helping you get ready to energise your property with a tailored solar solution from assessment and system design to installation and application support.

New Technology

What Is Solar ATAP?

Solar ATAP is Malaysia’s rooftop solar programme that allows electricity consumers to generate renewable energy at their own premises and offset electricity usage through on-site consumption. For homeowners, it can also support a more structured solar panel for home plan when the system is designed around actual household usage.

Introduced on 1 January 2026, Solar ATAP continues the rooftop solar framework established under Net Energy Metering (NEM), enabling users to maximise self-consumption while receiving bill credits for surplus energy exported to the grid.

Process of Solar ATAP

Solar panels generate electricity during daylight hours.

The property uses the generated electricity first.

Excess solar energy may be exported to the grid.

TNB supplies electricity when solar generation is insufficient.

The Solar ATAP contract period is up to 10 years. After that period, the installed system may continue operating for self-consumption, subject to the applicable requirements.

Best Solution for you

Who Can Apply for Solar ATAP?

Solar ATAP is available to eligible TNB consumers in Malaysia, subject to regulatory, technical, and utility approval requirements.

Applicant TypeGeneral Capacity Direction
Single-phase domestic propertyUp to 5 kW without additional connection assessment
Three-phase domestic propertyUp to 15 kW without additional connection assessment
Larger domestic installationMay require a Connection Confirmation Check
Commercial and industrial propertyUp to 100% of recorded Maximum Demand, subject to assessment
Non-domestic maximumUp to 1,000 kW, subject to network and technical approval

Solar ATAP applications must be submitted through an appointed Registered Photovoltaic Service Provider using the official eATAP process.

Eligibility and final capacity approval remain subject to the latest SEDA Malaysia, Energy Commission, and TNB requirements.

Our Solutions

How Solar ATAP Benefits Your Property

Reduced Grid Electricity Consumption

Solar energy generated during the day is consumed on-site first, reducing reliance on grid electricity during peak sunlight hours.

Bill Credits for Excess Energy

When generation exceeds on-site demand, eligible surplus energy may be exported to the grid and reflected as credits under the Solar ATAP framework.

Optimised Use of Rooftop Assets

Rooftops of factories, warehouses, offices, commercial buildings, and residential properties can be transformed into productive energy-generating assets.

Support for Sustainability Goals

Businesses can use rooftop solar to support carbon reduction planning, ESG commitments, and wider renewable energy strategies.

BESS Integration

A battery energy storage system (BESS) solution may be considered alongside Solar ATAP where the project requires energy storage, flexibility, or additional system support.

SuRIA Home

SuRIA Home 2026 - Solar Rebate for Residential Solar

SuRIA Home is a residential incentive connected to Solar ATAP. It provides eligible Malaysian domestic consumers with a one-time cash rebate of RM600 per kWac, capped at RM3,000.
The incentive is available on a first-come, first-served basis from 1 June to 31 December 2026, or until the available allocation is fully distributed. Applicants must meet the official programme conditions.

EFS Group collaboration with suria home poster image

Our Solutions

How EFS Group Supports Your Solar ATAP Project

Testimonials

A Proven Track Record in Grid-Scale Delivery

Raj Kumar
EFS Revision made the Solar ATAP process much easier to understand. The team explained the application steps, system sizing, and expected energy savings clearly before we moved forward.
Kelvin Lee
The team was professional throughout the rooftop solar project. They reviewed our electricity usage, assessed the property carefully, and kept us updated during the installation and commissioning stages.

Explore Solar ATAP With EFS Group

The optimal rooftop solar PV system should be designed in alignment with your electricity consumption profile, site conditions, approved capacity limits, and long-term energy objectives.

Speak with EFS Group to explore Solar ATAP solutions in Malaysia for residential, commercial, industrial, and large-scale facility applications.

FAQS

Frequently Asked Questions

Solar ATAP stands for Solar Accelerated Transition Action Programme. It supports rooftop solar for self-consumption and qualifying excess-energy credits.

Yes. EFS supports assessment, design, installation, commissioning and long-term solar O&M, subject to official approval.

Solar ATAP began on 1 January 2026. Applications are submitted through the official eATAP system.

No. Eligible TNB commercial and industrial consumers may apply, subject to Maximum Demand, technical and network requirements.

Yes. BESS may be integrated with Solar ATAP, subject to the required technical and regulatory conditions.

The contract period is up to 10 years. After that, the system may continue for self-consumption without export credits or rollover.